A DAY IN THE LIFE OF A ROOFER:
(CLICK ON PHOTOS TO ENLARGE)
The decayed wood was removed and replaced with treated timber.
Ply-board was then laid on top of the renewed timbers.
A vapour barrier was installed along with insulation boards.
07788524207 / 01333 350156
© 2022 Silken @ SPS Fife Ltd
The roof is then completed with a single ply membrane